LAND CORNERS    Click on the LAND CORNER ID to view the detailed information.
Click on Column Heading to sort by that field.
Prev Page    Next Page
pagelist:
Land Corner ID Township Range Section Location Monument Description Surveyed Date
10_74_6_36   T74N  R06W  36  SE CORNER  Set Conc Monu over Fd. 7/8" x 3/8" x ? Old Buggy Iron ? By Wood Triangle Shaped Stake 2.3' Deep, 4/26/89, Richard Hammond  7/18/1994 
10_75_6_12   T75N  R06W  12  SE CORNER   Fd 5/8" Rebar 12" deep 5/26/05  5/26/2005 
11_75_6_24   T75N  R06W  24  E1/4 CORNER SE1/4 SE1/4  Fd. 3/4" Rod Set Rebar Over, 8/21/87 by Washington Co  8/21/1987 
12_74_6_01   T74N  R06W  SE CORNER.-NE1/4-SE1/4  Stone-1910  1/1/1967 
12_74_6_24   T74N  R06W  24  NE Corner SE1/4 SE1/4  Fd 1" Pin  5/12/2007 
12_76_6_01   T76N  R06W  NE Corner SE1/4 SE1/4  Set 5/8" Red Capped Rebar LS# 8144 exposed  6/20/2008 
15_74_6_13   T74N  R06W  13  E1/4 CORNER  Fd. 5/8" rebar 6" deep, 11/19/01 by Robert J. Bauer  11/19/2001 
15_74_6_24   T74N  R06W  24  E1/4 CORNER  Fd. Stone  5/12/2007 
15_74_6_25   T74N  R06W  25  E1/4 CORNER  Fd 1" Pipe by John Lance 6/15/06  6/15/2006 
15_75_6_12   T75N  R06W  12  E1/4 CORNER  Fd. RR Spike Replaced with 5/8" Rebar with Cap, 4/20/98 by Robert Bauer  4/20/1998 
15_75_6_13   T75N  R06W  13  E1/4 CORNER  Fd. Iron Pin 16" deep Set 5/8" Iron Pin with Alum Cap Above, 2/2/95 by Dunae Meinen  2/2/1995 
15_75_6_24   T75N  R06W  24  E1/4 CORNER  Set capped Iron pin Robert Bauer  4/21/1997 
15_75_6_36   T75N  R06W  36  E1/4 CORNER  Fd. Iron Pin 3" deep, 11/1/94 by Robert Bauer  11/1/1994 
15_76_6_01   T76N  R06W  E1/4 Corner  Fd 5/8" Yellow Capped Rebar LS# 14675 exposed  6/20/2008 
15_76_6_25   T76N  R06W  25  E1/4 CORNER  Fd. 3/4" Iron Pin, 2/25/91 by Dean Beranek  2/25/1991 
15_76_6_36   T76N  R06W  36  E1/4 CORNER  Fd. T-Bar, 12/27/95 by Douglas Frederick  12/27/1995 
15A_74_6_13   T74N  R06W  13  E1/4 CORNER  Fd. 5/8" Rebar 10" deep, 8/15/88 by Washington Co  8/15/1988 
17_74_6_01   T74N  R06W  NE CORNER.-SE1/4- NE 1/4  Stone-1910  1/1/1967 
17_75_6_12   T75N  R06W  12  E1/4 CORNER-NE1/4  Set 5/8"X30" Rebar with Cap, 4/20/98 by Robert Bauer  4/20/1998 
19.5_74_7_29   T74N  R07W  29  N1/4 CORNER-NE1/4-NE1/4-NE1/4  Stone-1900  1/1/1900 
19_74_6_01   T74N  R06W  NE CORNER  Fd. Iron Pin with Cap in P.C.C. Slab, 11/1/94 by Robert Bauer  11/1/1994 
19_74_6_12   T74N  R06W  12  NE CORNER  Iron Pin 8" deep, 1969 by Washington Co  1/1/1969 
19_74_6_13   T74N  R06W  13  NE CORNER  Stone-1906  8/15/1988 
19_74_6_25   T74N  R06W  25  NE CORNER  Found 2" Brass Disk in pavement  4/8/2008 
19_75_6_01   T75N  R06W  NE CORNER  Fd. Iron Pin in Pavement, 8/28/96 by Robert Bauer  8/28/1996 
19_75_6_12   T75N  R06W  12  NE CORNER  Fd. Rebar, 4/20/98 by Robert Bauer  4/20/1998 
19_75_6_24   T75N  R06W  24  NE CORNER  Set PK nail in asphalt Robert Bauer  4/21/1997 
19_75_6_25   T75N  R06W  25  NE CORNER  Fd. T-Bar, 10/28/93 by Robert Huber  10/28/1993 
19_76_6_01   T76N  R06W  NE CORNER  Iron Pin-1985  1/1/1985 
19_76_6_12   T76N  R06W  12  NE Corner  Fd 5/8" Yellow Capped Rebar LS# 14675 0.1' deep  6/20/2008 
20A_77_6_36   T77N  R06W  36    P.T. STA 283+39.45   
22A_76_8_30   T76N  R08W  30    Stone   
23_74_9_16   T74N  R09W  16  CENTER-NE1/4-SE1/4  Stone-1900  1/1/1900 
23A_74_7_24   T74N  R07W  24    Set Conc Monu P.I. STA 161+18.00, 6/5/91 by Washingto Co  7/26/1993 
23A_75_6_34   T75N  R06W  34    Chipped X in Pavement P.C. STA 40+49.05, 7/17/87 by Washington Co  7/17/1987 
23A_77_6_19   T77N  R06W  19    Set Rebar, August 1989 by Washington Co  8/1/1989 
23B_77_6_19   T77N  R06W  19    Set Rebar over T-Bar, August 1989 by Washington Co  8/1/1989 
25/15_77_8_15   T77N  R08W  15  N1/4 CORNER-NE1/4-NE1/4-SE1/4  Stone-1914  1/1/1914 
25_76_9_31   T76N  R09W  31  NW CORNER NE 1/4 SE 1/4   Fd 12"x14"x3" Limestone exposed 11/18/04  11/18/2004 
25_77_7_30   T77N  R07W  30  N1/4 CORNER-NE1/4-SE1/4  P.I.   
25_77_8_15   T77N  R08W  15  N1/4 CORNER-NE1/4-SE1/4  Stone-1914  1/1/1914 
25A_74_7_24   T74N  R07W  24    Set Iron Pin P.T. STA 165+71.80, 6/19/90 by Washington Co  7/13/1993 
26_74_9_16   T74N  R09W  16  CENTER-SE1/4-NE1/4  Stone-1900  1/1/1900 
27_74_9_16   T74N  R09W  16  N1/4 CORNER SE1/4-NE1/4  Stone-1900  1/1/1900 
27_77_8_15   T77N  R08W  15  N1/4 CORNER-SE1/4-NE1/4  Stone-1914  1/1/1914 
27A_77_7_30   T77N  R07W  30    Brass Plug STA 47+27.20   
28_74_9_16   T74N  R09W  16  CENTER-NE1/4-NE1/4  Stone-1900  1/1/1900 
28_77_8_24   T77N  R08W  24  CENTER-NE1/4-NE1/4  60d Spike-1971  1/1/1971 
29_74_9_16   T74N  R09W  16  N1/4 CORNER-NE1/4-NE1/4  Stone-1900  1/1/1900 
29A_74_7_27   T74N  R07W  27    Iron Pin P.I. STA 47+31.05, 1976 by Washington Co  1/1/1976 
Prev Page    Next Page
pagelist: